Order a project's work item types
Set the order and the default of the types a project offers.
PATCH
Scope
projects:write. Same rights and the same 409 for a template-linked project as when offering a type.Body parameters
string[]
required
The ids of every offered type that is not phasing out, in the new order. The list must match what the project offers; otherwise the answer is
422.string
required
The default type. It must be one of the listed types.
Response
Status200 with the entries in their new order.
Last modified on October 23, 2026