Polls
Update poll
Change a draft poll’s question, answers, audience or deadline, saved against the version you read.
PATCH
Send
baseUpdatedAt plus any of the fields of Create poll. Fields
you leave out keep their value; type, choices and scale are checked again together. Only a DRAFT
can be changed. If the poll was changed or opened since you read it, the request returns
409 CONFLICT; read it again.
Scope
meetings:write. Organizers and co-organizers, and participants too when the meeting lets them
record outcomes. The meeting must not be closed or cancelled.Path parameters
string
required
The meeting.
string
required
The draft poll.
Request body
string
required
The poll’s
updatedAt as you read it, ISO 8601 in UTC.string
Up to 300 characters.
string
YES_NO_ABSTAIN, SINGLE_CHOICE, MULTIPLE_CHOICE or SCALE.string[] | null
2 to 12 distinct labels, each up to 200 characters.
object | null
min, max (0 to 10, min below max), minLabel, maxLabel.string | null
Must belong to this meeting.
boolean
string
INVITED or PRESENT.string | null
ISO 8601 in UTC. Must lie in the future.
Response
object
required
Last modified on October 4, 2026

