The Backlog lists the open work items of a project and the cycles they are planned into. Rank the work by dragging it, then drag it into the next cycle. It is where sprint planning happens.

What the Backlog shows

Completed work items do not appear in the backlog section. When the project limits cycles to certain types under Settings → Cycles → Allowed work item types, only those types are listed. Work items without a type always appear.

Rank the work

Drag a work item up or down within the backlog or within a cycle lane. The new order is saved at once and everyone sees it. Put the most important work at the top. You can also edit the estimate of a work item directly in its row, using the project’s estimation method.

Plan work into a cycle

1

Create a cycle if needed

Click Create Cycle, enter a Name and optionally a Cycle Goal, Start Date and Due Date, then confirm.
2

Move the work items

Drag a work item from the backlog into the cycle lane. Or right-click it and choose Move to Cycle, then the cycle.
3

Check the lane

The work item appears in the cycle lane. To take it out again, right-click it and choose Move to Backlog.
Work items move one at a time. When the project has Carry child work items or Carry parent work item switched on, the sub-items or the parent move along (see Subtasks and cycles).
Moving work between the backlog and cycles needs the Manage cycle scope permission. Without it, the lanes are locked and a drop shows Move blocked. Creating a cycle needs Create cycle.
Add work item below the backlog opens the create dialog.

Limits

  • The Backlog has no search and no quick filters. To find work items by field, use the Work Items table or search.
  • There is no multi-select. You move, rank and edit work items one at a time.