Skip to main content
A project does not design its own statuses. It uses workflows that a system administrator builds in Design workflows. In the project you choose which of them apply, which one is the default, and which work item type follows which workflow. Who can do this: members whose Space role may edit project settings. If the project is linked to a project template, the template decides and this section is read-only.

Which workflow a work item follows

A project can use several workflows. For each work item, Collabase picks the first one that applies, in this order: Without any workflow, members can set any status directly. With a workflow, they can only use the transitions it defines.

Assign workflows

1

Open the Status section

Open the project, click the Settings tab and select Workflow → Status.
2

Add a workflow

Click Add Workflow, search for the workflow and select it. The first workflow you add becomes the Default.
3

Change the default (optional)

Hover over a workflow and click Set as default. If work items already exist, see Switch the default workflow.
Click View workflow to see a workflow’s statuses, and Edit Workflow in that preview to open it in the editor. To add or remove statuses, change the workflow itself; the project section only assigns workflows.

Map work item types to workflows

When a project has two or more workflows, the section Workflow → Work Item Type Mapping appears. It lists the instance work item types.
1

Pick a workflow per type

For each type, choose a workflow, or leave Project default.
2

Save

Click Save. You see Workflow mapping saved.
Example: bugs follow a triage workflow, everything else follows the team’s delivery workflow.

Switch the default workflow

When work items already sit in statuses of the old workflow, Collabase asks where they should go.
1

Set the new default

Click Set as default on the new workflow and save.
2

Map the statuses

The dialog Reassign existing tasks lists each Current status. Pick a New status from the new workflow for each one.
3

Confirm

Click Migrate & Save. The work items move to the new statuses and the project uses the new default.

Move a work item through the workflow

Members change the status on the work item or by dragging its card on the board. Collabase offers only the transitions that start at the current status and whose conditions are met. If the transition asks for fields, a dialog opens. Fill in the fields marked with an asterisk and click Confirm Transition. If a validator fails, the work item stays where it is and the message says what is missing. To see where a work item can go next, open the status menu on the work item and click View workflow at the bottom. A popup shows the whole workflow of the work item as statuses and transitions, with the current status ringed. It is read-only: you can pan and zoom, but not change anything. The entry is there in every project, also when no transition is available from the current status.

Troubleshooting

Design workflows

Statuses, transitions and rules.

Project settings

Every section of a project’s settings.
Last modified on November 4, 2026