Columns and cards
By default every status of the project’s workflow is one column, in workflow order. A project admin can replace this with custom columns that group several statuses (see Configure the board). Each column header shows the name, the number of cards and an Add button. Add work item at the bottom of a column opens the create dialog.- Drag a card within a column to change its order.
- Drag a card to another column to change its status. Columns the workflow does not allow are marked while you drag: This item cannot be moved to this column due to the workflow configuration.
- Click a card to open the work item.
Filter the board
The chips above the board narrow what you see. They do not change the board for anyone else. The board loads only the work items that pass the chips: Only mine, Recently changed, Status, Assignee, Priority, Label, the quick filters your project lead defined, and any other field under More fields. Several values in one chip match any of them. Several chips match only the items that pass all of them. Reset switches every chip off. The same chips apply on Work Items and Timeline, and the address of the page holds them, so a link shows the same selection. See Quick filters and columns.Show one cycle
When the project uses cycles, the Sprint chip lists them. Tick the cycle you want to see, or several. The board opens on all work items. If more than 5,000 work items match, the board shows the first ones and tells you to narrow the filter.Configure the board
The configuration applies to everyone who opens the project’s board. Members whose role has the Configure board permission see the Board Config button on the Board.1
Open the configuration
On the Board, click Board Config. The Board Configuration dialog opens with the tabs Columns, Card Colors, Card Fields, Swimlanes and Behavior.
2
Make your changes
Change one or more tabs, as described below.
3
Save
Click Save Configuration. Everyone sees the new board the next time it loads.
Columns
Switch on Custom Columns to replace the one-column-per-status layout. Drag statuses from Available Statuses into Board Columns, add a column with Add Column, rename it inline, and drag columns into order. A column can hold several statuses.Card colors
Card colors highlight work items that need attention, such as blocked or high-priority items.
A condition compares Status, Priority, Assignee or Label with is or is not. Rules run top to bottom and the first match wins, so put the most important rule first.
Card fields
Choose up to three fields to show on each card: Priority, Due Date, Labels, Work Item Type, Story Points, Estimate, or a custom field of the project.Swimlanes
Swimlanes split the board into horizontal rows. Switch on Swimlanes, then click Add swimlane and define its conditions with Add condition, using the same fields and operators as card colors. A work item goes into the first lane it matches. Items that match no lane appear under Remaining Work Items. You can collapse a lane on the board.Behavior
Auto-hide Completed Tasks hides work items that have been done or closed for longer than Hide after a number of days. The default is 14 days, the range 1 to 365.The board has no column limits (WIP limits) and no flag on cards. To highlight blocked work, use a label and a card color rule.
Next steps
Work Items table
The same work items in a sortable table.
Backlog
Rank work and plan it into cycles.