Skip to main content
A task represents a single unit of work — a feature request, bug report, support ticket, review item, or anything else your team needs to track. Every task lives inside a Project and has a structured set of fields that make it searchable, assignable, and automatable.

Task fields

Every date field takes a typed date as well as a pick from the calendar. Type the day first, for example 14.7.2026, 14.07.26 or 14.7. for the current year, and press Enter. In the calendar, click the month to choose another month, and then the year to choose another year. | Custom Fields | Additional fields configured by your admin for specific task types. |

Creating a task

1

Open the project

Navigate to your Space and select the project.
2

Start a new task

Click Add work item on the Board, in Work Items or in the Backlog. From anywhere in Collabase, you can also use Create → Create Work Item.
3

Fill in the required fields

Title is required. Type defaults to the project’s default task type. All other fields are optional and can be updated later. Below the description, the status, assignee, Start date, Due date, labels, priority and estimate are chips you click to set. If the project uses cycles, a Cycle chip puts the work item into a cycle, and Parent makes it a subtask of another work item from the start. If the project uses estimation, an estimate field (story points, T-shirt size, or hours, depending on the project’s method) is available here so you can size the task as you create it.
4

Save

Press Enter or click Create. The task is created and appears in the first status column on the board.

Task detail view

Click any task to open its full detail view. The detail view is organized into sections: You can open a work item in a new tab from the Board, the Work Items table, the Backlog and the sub-item list: click its title with the middle mouse button or hold Ctrl (Cmd on a Mac), or open the context menu of the title. In the Work Items table, hold Ctrl or Cmd while you click a row, or click it with the middle mouse button.
Whether sub-items move together with their parent between the backlog and a cycle depends on the project’s cycle settings. See Subtasks and cycles.

Change the type

Click the Type field in the detail view and choose another type. The menu lists every type of the project. If the new type works with the same workflow, the work item keeps its status. If it works with another workflow, the current status does not exist there. Collabase then asks for the status the work item lands in, and proposes the status with the same meaning as the current one. Choose a status and click Change type. The work item moves into that status and continues from there; it does not have to be the first status of the workflow.

Comments: Internal vs. External

Every comment has a visibility setting: Default visibility is Internal. Switch before posting if the comment is intended for the customer.

Subtasks

Subtasks are tasks nested under a parent task. They have all the same fields as a regular task. To add a subtask, open a task’s detail view and type a title into the field below Subtasks, then press Enter. The icon before the field shows the type the new subtask gets, which is the type of the parent until you change it. Click the icon to choose any other type of the project. The new subtask is linked to the parent and inherits the same project and sprint. Where subtasks show up depends on the view:
Searching or filtering Work Items switches the table to a flat list of matches, so a matching subtask is shown on its own even when its parent does not match.

Relations

Relations show how work items depend on each other. Open a work item, go to Relations, click Add, pick a Relation type and the other work item, then confirm with Link work item. Blocks relations appear as arrows on the Timeline, where you can also draw them. Adding relations needs the Link task permission.

Relation graph

Click Graph in the top bar of a work item to open the Relation Graph. It shows the work item with its relations, sub-items, linked pages and test cases. Use Show to choose which kinds of items appear and Depth (1 to 4) to follow relations further. Right-click a node to open it.

Integration panels

The task detail view includes integration panels that provide context from other parts of Collabase without leaving the task. Click the icons in the top bar of the task to open a panel on the right side. Click the active panel icon a second time to close the panel and return to the activity feed.

Test Management panel

The Tests panel shows two things:
  1. Linked test cases — the test cases in your Test Management module that cover this task. These are set from the test case’s edit form. Click the external link icon next to a case to open Test Management.
  2. Test milestone — the milestone this task is associated with. Use the dropdown to link the task to a milestone or switch it to a different one. Click × to remove the association.
Updating the milestone from the Tests panel requires the Edit Task permission. Viewing the panel requires the View Test Results permission.

Copy, move and delete

The menu in the top right of a work item offers: Press Cmd + Enter (Mac) or Ctrl + Enter (Windows and Linux) to post a comment. For all shortcuts, see Keyboard shortcuts.
Collabase has no bulk change. You change work items one at a time, in the detail view or inline in the Work Items table.

Moving a work item to another project

A work item can be moved to a different project, including a project in another Space. Open the work item, then choose Move work item from the menu in the top right. The entry appears only if your role includes the Move task permission. The move runs in three steps.
1

Choose the destination

Search for the target project. Only projects you may create work items in are listed. Then pick the work item type it should use there. The type decides which workflow applies, and therefore which statuses you can map onto in the next step.
2

Map statuses and fields

Each status currently in use gets a destination column. Collabase preselects a column with the same name, or failing that one in the same state. Any custom field values the destination cannot show are listed here, so you see what will be set aside before you commit.
3

Review and confirm

The summary shows how many items will move and how many field values will be archived. Confirm to run the move.

What changes

The old key keeps working. Links in comments, notifications and bookmarks continue to open the work item at its new location, and the old key is never reused by another item.
A move cannot be undone in one action. Archived field values are stored and can be recovered by an administrator, but moving the item back does not restore them automatically.

Custom fields

Custom fields extend the standard field set with fields specific to your workflow. They are configured by an admin and attached to task types. The following field types are available: Text, Textarea, Select, Multi-select, User, Multi-user, Date, Checkbox, Number, Rating, Progress, Location, Registry Object, Relation, Object Relation, Priority, URL, Email, Phone, Currency. A URL field takes links of up to 8192 characters with the scheme http, https, elodms (ELO document links) or mailto. Enter the full address including the scheme; www.example.ch is rejected. A link saved earlier stays as it is until you change it. Custom field values appear in the right sidebar of the task detail view. Admins configure which fields apply to which work item types, see Custom fields.

Who can do what with tasks

Task actions are controlled by the space’s Permission Scheme. The table below shows the defaults — your space may use a custom scheme with different settings.
If you see a “Forbidden” error when trying to perform an action, your space role does not include that permission under the current scheme. Contact your Space Admin to adjust your role or the scheme.
Last modified on November 4, 2026