Developer Platform: MCP server availableDeveloper Platform: MCP server available, App SDK from Q4 2026

Quality Engineering

Requirement, test case and defect in the same space.

No switching between test management, item list and documentation. A failed test becomes a work item with one click.

Why now

The same question before every release. Which requirement was tested, and with what result?

Test cases sit in one tool, work items in a second, requirements in a third, and the report comes out of a spreadsheet. What connects them is a column of numbers somebody maintains by hand.

01

The defect loses its link to the requirement along the way.

02

Coverage lives in a spreadsheet that is already out of date by release day.

03

A test run cannot be repeated without assembling it again.

Capabilities

The link is made while working. Before the report is even due.

01

Test cases on the requirement

A test case hangs off the story or requirement it came from. The link is a relation in the system, visible in both directions.

02

Test runs with environment and assignment

A run records who tested, on which environment and with what result. Repeating means starting, not assembling again.

03

Defect as a work item, straight from the test

A failed test becomes a work item with one click. The title is prefilled; you choose project, priority and cycle when creating it.

04

Coverage from real data

Which requirement was tested how often and with what outcome is read from the runs. The hand-kept matrix goes away.

05

Quality Tree Framework as the frame

Collabase maps the Quality Tree Framework™ onto test cases and runs. Maturity levels and practices hang off the same test cases and runs your team works with, instead of living beside them in a deck.

One day

Regression testing before a release. From the test plan to the published report.

Platform

The apps behind it. All in the same space, no second tool.

Test Management carries the testing, Projects the work items beside it, Docs the requirements and Automation the repetition.

Integrations

Connected to the workbench. Connections from everyday testing.

See all integrations

Builds from version control, error data from production, work items from an existing tool, results into the channel.

Operations

One product, one vendor. Test Management is part of it.

Test management belongs to the same product as work items and documentation. There is no second tool for the test cases and no add-on to keep running alongside.

One contract, one point of contact.

All modules from one vendor, with nothing extra to buy.

Operated in a Swiss data centre or on your own hardware.

Evidence for the compliance review

Information security is certified to ISO 27001 and processing meets the nFADP and the GDPR. The documents are ready before you ask for them.

Read the sovereignty promise

The framework behind the practices

The Quality Tree Framework™ by Serge Baumberger organises the maturity levels and practices of quality engineering. Collabase maps them onto test cases and runs.

Questions from test management. What comes up first in an initial conversation.

What is quality assurance for test teams with Collabase?

Test cases hang off requirements, runs record environment, assignment and result, and a failed test becomes a work item with one click. Coverage is read from the runs.

Can we feed in automated test results?

Results can be reported to a test run today through the HTTP integration.

How is a requirement linked to a test case?

As a relation between two objects in the same space, visible in both directions: the requirement shows its test cases, the test case shows its requirement.

Are there coverage metrics?

Yes, read from the runs: tested, open and failed, per requirement and per release.

Can we manage environments and test data?

Environments hang off the test run and can be reported on. Test data goes into a Registry directory with the fields you need.

How does the Quality Tree Framework™ relate to Collabase?

The framework comes from Serge Baumberger. Collabase maps its maturity levels and practices onto test cases and runs. What Collabase costs in your case is set in the quote, once scope and operating model are clear.

Other disciplines in the same system.

Test it against your own content. A proof of concept is ready within days.

We set up an instance with your content and you test it against real workflows. In a first conversation we clarify scope, operating model and timing.